Job Flow |
 |
 |
Mobilization
- Mobilize Desiccant Dehumidification Technical Consultant
- Mobilize Desiccant Dehumidification Project Manager
- Mobilize Equipment and Crew
- Transport Equipment and Crew
Inspection, Assessment, and Testing
- Inspect and Assess Water Damage to Structure
- Test Moisture Content of Structural Materials
- Establish Baseline Moisture Content of Structural Materials
- Determine Ambient Specific Humidity
- Establish Baseline Ambient Specific Humidity
Project Requirements
- Size Dehumidification and Evaporation Equipment
- Assess Safety and Security Issues
- Assess Electrical Requirements
- Determine Access For Return and Supply Ducting
- Submit Scope of Work and Project Cost
- Install Dehumidifiers and Airmovers
- Carpentry as Required
- Electrical as Required
- Engineer Temporary Ducting
- Install Temporary Ducting
- Power-up Dehumidifiers
- Unload Airmovers
- Install Airmovers
- Power-up Airmovers
- Remove cove base and trim where necessary
- Perforate walls and flooring where necessary
Monitoring and Testing
- Test and Record Moisture Content of Structural Materials
- Test and Record Ambient Specific Humidity
- Project Maintenance
- Re-Engineer Temporary Ducting as Require
Project Completion and Demobilization
- Final Inspection and Walk Through
- Remove Temporary Carpentry
- Remove Temporary Electrical
- Remove Soft Ducting
- Remove Airmovers
- Load Airmovers
- Transportation of Equipment and Crews Back To Operations Base
|
|